Egypt · Project record 2014 – 2026

Every projectbegins with a line.

An architectural practice founded in 2014. Planning, design, construction and finishing developed from it over different periods, overlapping as the work grew — across seven governorates. This is the Egypt record, station by station.

Sheikh Zayed Civil Registry · Giza · from the project record

100+Projects and works in Egypt
30+Ministry of Interior projects
395,000m² of urban planning (documented 2014–2017)
07Governorates

Four lines. One record.

Four parallel lines run down this page. Each line begins in its own period — the practice started with architecture in 2014 — and each station marks only the disciplines delivered within our scope.

  1. Planning2014 – 2021
  2. Design2014 – 2025
  3. Construction2017 – 2025
  4. Finishing2017 – 2025
01

Urban planning, Menoufia.

2014 – 2021
  • Planning
  • Design

The practice began with land. Subdivision and development schemes in Menoufia — Al-Naggar across four phases, each approved by decree, with further development schemes alongside. The documented portfolio (2014–2017) totals 395,000 m².

Role
Planning & design · Z Arch Hub
Documented area
160,000 m² Al-Naggar + 235,000 m² other schemes
Approvals
Four Al-Naggar phases by decree
Al-Naggar subdivision · visual interpretation derived from the original CAD drawing — not a certified cadastral plan
02

Civil Registry upgrade programme.

2018 – 2023
  • Construction
  • Finishing

Fourteen civil registry locations across five governorates: public-service halls refurbished and fitted out, with fire-fighting and automated queue-calling systems within the assigned scope.

Executing entity
Zein Group · Egypt
Direct client
Al-Fath for Consulting & Projects — a Ministry of Interior investment-system company
Beneficiary
Egyptian Ministry of Interior

Giza

  • Sheikh Zayed First Civil Registry
  • Sheikh Zayed Second Civil Registry

Aswan

  • Aswan Issuance Centre
  • Daraw
  • Kom Ombo
  • Nasr Al Nuba
  • Edfu

Luxor

  • Luxor City
  • Al Bayadiya
  • Armant

Menoufia

  • Birket Al Sab

Qalyubia

  • Tanan
  • Sindyoun
  • Banha
Sheikh Zayed Civil Registry · façade
Sheikh Zayed Civil Registry · façade
Sheikh Zayed · public-service hall
Sheikh Zayed · public-service hall
Kom Ombo Civil Registry · Aswan
Kom Ombo Civil Registry · Aswan
Aswan Issuance Centre · interior
Aswan Issuance Centre · interior
1st October Civil Registry · participation
1st October Civil Registry · participation
Luxor City Civil Registry
Luxor City Civil Registry
03

Security facilities.

2018 – 2023
  • Construction
  • Finishing

Six police and security sites across Aswan, Menoufia and Qalyubia, covering eight contracting scopes: refurbishment, upgrades and supplementary works.

Executing entity
Zein Group · Egypt
Direct client
Al-Fath for Consulting & Projects — a Ministry of Interior investment-system company
Beneficiary
Egyptian Ministry of Interior

Aswan

  • Edfu Police Centre — refurbishment & supplementary works

Menoufia

  • Birket El Sabaa Police Centre
  • Birket El Sabaa Police Station
  • Menoufia Security Directorate — two supplementary scopes

Qalyubia

  • Second Banha Police Station
  • Qalyubia Permits Office
Edfu Police Centre · gate
Edfu Police Centre · gate
Edfu Police Centre · façade
Edfu Police Centre · façade
Birket El Sabaa Police Centre
Birket El Sabaa Police Centre
Second Banha Police Station · during execution
Second Banha Police Station · during execution
Menoufia Security Directorate
Menoufia Security Directorate
04

Al-Khamayel, 6th of October.

2018 – 2025
  • Construction
  • Finishing

Five Phase IV contracts: excavation, structure, façades and staircases, with semi-finishing of apartments. The deepest line in the record — from the ground up.

Executing entity
Zein Group · Egypt
Client
Ministry of Interior Land Projects Fund · Al-Khamayel
Contracts
Central B · Contract 1 · Contract 3 · supplementary works for 1 and 3
Phase IV · aerial
Phase IV · aerial
Phase IV · courtyards
Phase IV · courtyards
Phase IV · blocks
Phase IV · blocks
Structure · during execution
Structure · during execution
Structure · during execution
Structure · during execution
Façades
Façades
05

Participations.

2018 – 2023
  • Construction
  • Finishing

Partial scopes inside larger Ministry of Interior works, counted within the 30+ MOI total.

Beneficiary
Egyptian Ministry of Interior

Scopes

  • Upgrade of the Police Academy conference hall, New Cairo
  • Upgrade of October 1st and 2nd Civil Registry offices
  • Supplementary works at Edfu Police Station, Aswan
  • Birket El Sab Police Section upgrade — full execution
Police Academy conference hall · New Cairo
Police Academy conference hall · New Cairo
1st October Civil Registry · interior
1st October Civil Registry · interior
06

Private residential and finishing.

2017 – 2023
  • Design
  • Construction
  • Finishing

Nine residential buildings and thirty-six finishing units in Shebin El Kom, nine apartments and villas in the Fifth Settlement, six in 6th of October and two in Badr City — design, execution and interior finishing for private clients.

Executing entity
Zein Group · Egypt
Clients
Private clients

Locations

  • Shebin El Kom, Menoufia — 9 buildings · 36 finishing units
  • Fifth Settlement, Cairo — 9 units
  • 6th of October, Giza — 6 units
  • Badr City, Cairo — 2 units
Residential building · Shebin El Kom
Residential building · Shebin El Kom
Structure · Shebin El Kom
Structure · Shebin El Kom
Reception · delivered finishing
Reception · delivered finishing
Staircase · delivered finishing
Staircase · delivered finishing
Kitchen · delivered finishing
Kitchen · delivered finishing
Living room · delivered finishing
Living room · delivered finishing
07

Commercial and administrative.

2017 – 2025
  • Design
  • Finishing

Design and finishing for commercial operators and for the Group’s own offices.

Role
Design + finishing

Works

  • Taha Hussein Salon — Shebin El Kom and Mohandessin branches
  • Gym Heroes, Shebin El Kom — design and execution
  • Zein Group offices — Shebin El Kom and Al-Khamayel, 6th of October
Taha Hussein Salon · Mohandessin
Taha Hussein Salon · Mohandessin
Taha Hussein Salon · Shebin El Kom
Taha Hussein Salon · Shebin El Kom
Gym Heroes · Shebin El Kom
Gym Heroes · Shebin El Kom
Zein Group office · Al-Khamayel
Zein Group office · Al-Khamayel
Zein Group office · Shebin El Kom
Zein Group office · Shebin El Kom
08

Regwa Mosque, Beheira.

  • Construction
  • Finishing

Renovation, rehabilitation and full finishing of the mosque on the Cairo–Alexandria desert road. The photograph is of the completed building.

Role
Refurbishment & finishing contractor
Regwa Mosque · Cairo–Alexandria desert road
Regwa Mosque · Cairo–Alexandria desert road

Seven governorates.

Work references by governorate, as recorded — programmes, contracts, sites and units together.

  1. Menoufia55
  2. Giza17
  3. Cairo13
  4. Aswan7
  5. Qalyubia5
  6. Luxor3
  7. Beheira2
MenoufiaGizaCairoAswanQalyubiaLuxorBeheira

The line continues

Your project in Egypt is the next station.

A site to visit, a scope to price, a scheme to plan — tell us where the line should go next.