The GroupOur workDesignAASCTrading & supplyTechnology Capabilities Downloads Contact عربي

Our work · Regional project library

The record,station by station.

Every record states the project, our role within it and the direct client — nothing more. Photography is from the project record. Filter by country or by the line of work.

100+Projects and works · Egypt
10UAE locations · AASC
01Participation · Saudi Arabia
19Records in this library
Country
Line
19 records
  1. 01 Egypt Menoufia 2014 – 2021

    Urban planning, Menoufia

    • Plan
    • Design
    Type
    Urban planning
    Our role
    Planning & design · Z Arch Hub
    Urban planning, Menoufia · Al-Naggar subdivision · visual interpretation derived from the original CAD drawing
    Al-Naggar subdivision · visual interpretation derived from the original CAD drawing
  2. 02 Egypt Five governorates 2018 – 2023

    Civil Registry upgrade programme

    • Build
    • Finish
    Type
    Institutional programme · 14 locations
    Our role
    Zein Group · Egypt
    Direct client
    Al-Fath for Consulting & Projects — a Ministry of Interior investment-system company
    Beneficiary
    Egyptian Ministry of Interior
    Show sitesHide sites14
    • Giza — Sheikh Zayed First Civil Registry
    • Giza — Sheikh Zayed Second Civil Registry
    • Aswan — Aswan Issuance Centre
    • Aswan — Daraw
    • Aswan — Kom Ombo
    • Aswan — Nasr Al Nuba
    • Aswan — Edfu
    • Luxor — Luxor City
    • Luxor — Al Bayadiya
    • Luxor — Armant
    • Menoufia — Birket Al Sab
    • Qalyubia — Tanan
    • Qalyubia — Sindyoun
    • Qalyubia — Banha
    Civil Registry upgrade programme · Sheikh Zayed Civil Registry · façade
    Sheikh Zayed Civil Registry · façade
    Civil Registry upgrade programme · Sheikh Zayed · public-service hall
    Sheikh Zayed · public-service hall
    Civil Registry upgrade programme · Kom Ombo Civil Registry · Aswan
    Kom Ombo Civil Registry · Aswan
    Civil Registry upgrade programme · Aswan Issuance Centre · interior
    Aswan Issuance Centre · interior
    Civil Registry upgrade programme · 1st October Civil Registry · participation
    1st October Civil Registry · participation
    Civil Registry upgrade programme · Luxor City Civil Registry
    Luxor City Civil Registry
  3. 03 Egypt Aswan · Menoufia · Qalyubia 2018 – 2023

    Security facilities

    • Build
    • Finish
    Type
    Institutional programme · 6 sites, 8 scopes
    Our role
    Zein Group · Egypt
    Direct client
    Al-Fath for Consulting & Projects — a Ministry of Interior investment-system company
    Beneficiary
    Egyptian Ministry of Interior
    Show sitesHide sites6
    • Aswan — Edfu Police Centre — refurbishment & supplementary works
    • Menoufia — Birket El Sabaa Police Centre
    • Menoufia — Birket El Sabaa Police Station
    • Menoufia — Menoufia Security Directorate — two supplementary scopes
    • Qalyubia — Second Banha Police Station
    • Qalyubia — Qalyubia Permits Office
    Security facilities · Edfu Police Centre · gate
    Edfu Police Centre · gate
    Security facilities · Edfu Police Centre · façade
    Edfu Police Centre · façade
    Security facilities · Birket El Sabaa Police Centre
    Birket El Sabaa Police Centre
    Security facilities · Second Banha Police Station · during execution
    Second Banha Police Station · during execution
    Security facilities · Menoufia Security Directorate
    Menoufia Security Directorate
  4. 04 Egypt 6th of October, Giza 2018 – 2025

    Al-Khamayel, 6th of October

    • Build
    • Finish
    Type
    Residential development · 5 contracts
    Our role
    Zein Group · Egypt
    Project client
    Ministry of Interior Land Projects Fund · Al-Khamayel
    Al-Khamayel, 6th of October · Phase IV · aerial
    Phase IV · aerial
    Al-Khamayel, 6th of October · Phase IV · courtyards
    Phase IV · courtyards
    Al-Khamayel, 6th of October · Phase IV · blocks
    Phase IV · blocks
    Al-Khamayel, 6th of October · Structure · during execution
    Structure · during execution
    Al-Khamayel, 6th of October · Structure · during execution
    Structure · during execution
    Al-Khamayel, 6th of October · Façades
    Façades
  5. 05 Egypt Cairo · Giza · Aswan · Menoufia 2018 – 2023

    Participations

    • Build
    • Finish
    Type
    Partial scopes · 4 works
    Our role
    Beneficiary
    Egyptian Ministry of Interior
    Show sitesHide sites4
    • Scopes — Upgrade of the Police Academy conference hall, New Cairo
    • Scopes — Upgrade of October 1st and 2nd Civil Registry offices
    • Scopes — Supplementary works at Edfu Police Station, Aswan
    • Scopes — Birket El Sab Police Section upgrade — full execution
    Participations · Police Academy conference hall · New Cairo
    Police Academy conference hall · New Cairo
    Participations · 1st October Civil Registry · interior
    1st October Civil Registry · interior
  6. 06 Egypt Menoufia · Cairo · Giza 2017 – 2023

    Private residential and finishing

    • Design
    • Build
    • Finish
    Type
    Private residential · 9 buildings, 53 units
    Our role
    Zein Group · Egypt
    Direct client
    Private clients
    Show sitesHide sites4
    • Locations — Shebin El Kom, Menoufia — 9 buildings · 36 finishing units
    • Locations — Fifth Settlement, Cairo — 9 units
    • Locations — 6th of October, Giza — 6 units
    • Locations — Badr City, Cairo — 2 units
    Private residential and finishing · Residential building · Shebin El Kom
    Residential building · Shebin El Kom
    Private residential and finishing · Structure · Shebin El Kom
    Structure · Shebin El Kom
    Private residential and finishing · Reception · delivered finishing
    Reception · delivered finishing
    Private residential and finishing · Staircase · delivered finishing
    Staircase · delivered finishing
    Private residential and finishing · Kitchen · delivered finishing
    Kitchen · delivered finishing
    Private residential and finishing · Living room · delivered finishing
    Living room · delivered finishing
  7. 07 Egypt Shebin El Kom · Mohandessin · 6th of October 2017 – 2025

    Commercial and administrative

    • Design
    • Finish
    Type
    Commercial & administrative · 5 works
    Our role
    Design + finishing
    Show sitesHide sites3
    • Works — Taha Hussein Salon — Shebin El Kom and Mohandessin branches
    • Works — Gym Heroes, Shebin El Kom — design and execution
    • Works — Zein Group offices — Shebin El Kom and Al-Khamayel, 6th of October
    Commercial and administrative · Taha Hussein Salon · Mohandessin
    Taha Hussein Salon · Mohandessin
    Commercial and administrative · Taha Hussein Salon · Shebin El Kom
    Taha Hussein Salon · Shebin El Kom
    Commercial and administrative · Gym Heroes · Shebin El Kom
    Gym Heroes · Shebin El Kom
    Commercial and administrative · Zein Group office · Al-Khamayel
    Zein Group office · Al-Khamayel
    Commercial and administrative · Zein Group office · Shebin El Kom
    Zein Group office · Shebin El Kom
  8. 08 Egypt Beheira Completed

    Regwa Mosque, Beheira

    • Build
    • Finish
    Type
    Religious building · refurbishment
    Our role
    Refurbishment & finishing contractor
    Regwa Mosque, Beheira · Regwa Mosque · Cairo–Alexandria desert road
    Regwa Mosque · Cairo–Alexandria desert road
  9. 09 UAE Dubai 2025

    Silicon Central

    • Finish
    Type
    Retail branch
    Our role
    Fit-out contractor
    Direct client
    Deraah General Trading
    Status
    Completed
    Silicon Central · Storefront
    Storefront
    Silicon Central · Interior
    Interior
    Silicon Central · Displays
    Displays
    Silicon Central · Entrance
    Entrance
  10. 10 UAE Dubai 2025

    Arabian Center

    • Finish
    Type
    Retail branch
    Our role
    Fit-out contractor
    Direct client
    Deraah General Trading
    Status
    Completed
    Arabian Center · Storefront
    Storefront
    Arabian Center · Interior
    Interior
    Arabian Center · Displays
    Displays
    Arabian Center · Detail
    Detail
  11. 11 UAE Abu Dhabi 2026

    Dalma Mall

    • Finish
    Type
    Retail branch
    Our role
    Fit-out contractor
    Direct client
    Deraah General Trading
    Status
    Completed
    Dalma Mall · Storefront
    Storefront
    Dalma Mall · Interior
    Interior
    Dalma Mall · Mall frontage
    Mall frontage
  12. 12 UAE Abu Dhabi 2025

    Bani Yas

    • Finish
    Type
    Retail branch
    Our role
    Fit-out contractor
    Direct client
    Deraah General Trading
    Status
    Completed
    Bani Yas · Interior
    Interior
    Bani Yas · Storefront
    Storefront
    Bani Yas · Detail
    Detail
  13. 13 UAE Abu Dhabi 2025

    Madinti Mall

    • Finish
    Type
    Retail branch
    Our role
    Fit-out contractor
    Direct client
    Deraah General Trading
    Status
    Completed
    Madinti Mall · Storefront
    Storefront
    Madinti Mall · Interior
    Interior
    Madinti Mall · Displays
    Displays
    Madinti Mall · Mall frontage
    Mall frontage
  14. 14 UAE Sharjah 2025

    Administrative office

    • Finish
    Type
    Office
    Our role
    Fit-out contractor
    Direct client
    Deraah General Trading
    Status
    Completed
    Administrative office · Meeting room
    Meeting room
    Administrative office · Workstations
    Workstations
    Administrative office · Reception
    Reception
    Administrative office · Corridor
    Corridor
  15. 15 UAE Sharjah 2025

    Sharjah Central façade

    • Build
    • Finish
    Type
    Façade & cladding
    Our role
    Assigned execution
    Direct client
    Heritage Art
    Status
    Completed
    Sharjah Central façade · Façade
    Façade
    Sharjah Central façade · Coloured glass
    Coloured glass
    Sharjah Central façade · Wall cladding
    Wall cladding
    Sharjah Central façade · Detail
    Detail
  16. 16 UAE Dubai 2025 – 2026

    DAMAC Lagoons

    • Finish
    Type
    Villa communities · Malta 1, Malta 2, Portofino
    Our role
    Approved subcontractor · snagging, painting, integrated villa finishing
    Direct client
    WhiteSpot Facilities Management LLC
    Status
    Ongoing
    DAMAC Lagoons · Villas · Lagoons
    Villas · Lagoons
    DAMAC Lagoons · Villa exterior
    Villa exterior
    DAMAC Lagoons · Interior finishing
    Interior finishing
    DAMAC Lagoons · Finishing works
    Finishing works
    DAMAC Lagoons · Painting
    Painting
  17. 17 UAE Dubai 2025 – 2026

    DAMAC Hills 2

    • Finish
    Type
    Villa community
    Our role
    Approved subcontractor · villa finishing
    Direct client
    WhiteSpot Facilities Management LLC
    Status
    Ongoing
    DAMAC Hills 2 · Villas · Hills 2
    Villas · Hills 2
    DAMAC Hills 2 · Villas · Hills 2
    Villas · Hills 2
  18. 18 UAE Al Ain 12.2025 – 01.2026

    Flower Festival infrastructure

    • Build
    Type
    Event infrastructure
    Our role
    Canopies, irrigation network and interlock edging
    Direct client
    Al Sayegh Media L.L.C.
    Status
    Completed
    Flower Festival infrastructure · Canopy
    Canopy
    Flower Festival infrastructure · Irrigation network
    Irrigation network
    Flower Festival infrastructure · Canopy · daylight
    Canopy · daylight
    Flower Festival infrastructure · Flower beds
    Flower beds
    Flower Festival infrastructure · Irrigation · night works
    Irrigation · night works
  19. 19 KSA AMAALA, Red Sea 2024

    Four Seasons · AMAALA

    • Build
    Type
    Hospitality · participation
    Our role
    Blockwork and plastering within the assigned scope
    Direct client
    National Peaks Contracting Co.
    Four Seasons · AMAALA · Structure
    Structure
    Four Seasons · AMAALA · Scaffolding and blockwork
    Scaffolding and blockwork
    Four Seasons · AMAALA · Site crew
    Site crew
    Four Seasons · AMAALA · Interior works
    Interior works

The line continues

Your project is the next record.

Tell us the site, the scope and the timing — we reply with a site conversation, not a brochure.